tencent cloud

Data Transfer Service

Start Task

PDF
Mode fokus
Ukuran font
Terakhir diperbarui: 2024-07-08 20:31:47

Overview

After completing the verification task, users can either start the task directly from the verification operation page or from the task list page. The validity period for verification is 2 hours. If the task is not started immediately after verification and is started after 2 hours, the task needs to be re-verified.

Directions

1. Log in to the DTS console, select Data Migration on the left sidebar, select the target migration task, and click More > Immediate start in the Operation column.
2. In the pop-up window, confirm that everything is correct and click OK.

Bantuan dan Dukungan

Apakah halaman ini membantu?

masukan