tencent cloud

TencentDB for PostgreSQL

Multi-Task Conflict Check

Download
聚焦模式
字号
最后更新时间: 2024-11-04 10:23:49

Check Details

In PostgreSQL synchronization tasks, ring links are not supported during task configuration. If a ring link exists, the verification task will report an error. If the source end synchronization object has multiple tasks, an alarm will be triggered. Check whether the task configurations are reasonable.

Fixing Method

Follow the interface prompts to cancel tasks that have loopback or duplicate synchronizations, and then perform the verification task again.

帮助和支持

本页内容是否解决了您的问题?

填写满意度调查问卷,共创更好文档体验。

文档反馈